« US Pecan so delicious! | HomePage | Movement generation flashlight charger »
05/14/2008
Wang Ji Tong West, the diversion of Qiankun Jinqi
On the 5th century is the macro economic appear before the House of translation on the last day of a large number of elderly people especially went the construction site, once again look back at history.
In accordance with the design, Wang Ji Tong will be the first West, moving northward 12.14 meters, 17 meters further eastward movement and uplift about 40 centimeters, the whole project over to the difficulty of Jinan Weiliu Road the old translation.
Shandong University construction projects identified reinforcement to stay Jia, deputy director of the Institute East, said this translation works full computer monitor, not only to ensure the accuracy of translation, security has greatly improved. Several jack under the control of the computer simultaneously, while sensors on both sides of the building to monitor the speed of movement. Computer by controlling the supply of high pressure pump to jack the speed, the construction of the speed control of pan, pan speed of two meters per hour.
Upon completion of translation, machine screw jack with the power, construction will uplift the overall 40 cm, and the installation of isolation pads. After the installation of isolation pad construction grade 8 earthquake, over the relevant provisions of Jinan City standards. After renovation, Wang Ji Tong will become the first Chinese province old and famous museums.
10:10 Permalink | Comments (0) | Email this | Tags: Keystone_Jacks

